Private opportunity-first commercial intelligence

Pura Commercial & Contract Radar

Opportunity lanes and filters
Supporting views
BUYER

NETWORK RAIL INFRASTRUCTURE LIMITED

OPPORTUNITY

Wales & Western - Civils Examination Services (Earthworks)

SOURCE: Find a Tender · REFERENCE: 088822-2026
PUBLISHED: 18 Sep 2026 · 15:40 BST · LAST CHECKED: 9 Oct 2026 · 15:00 BST

AWARDED / HISTORICAL — not an open bid · source freshness LAPSED

OPEN ORIGINAL SOURCE

Current accessibility UNVERIFIED — link retained; no live source check implied

Readable source details and context
Buyer
NETWORK RAIL INFRASTRUCTURE LIMITED
Captured need / service scope
Civil examinations within Network Rail refer to the inspection, examination and reporting of structural assets to ensure the safety, reliability, and longevity of railway infrastructure. These examinations help identify defects, monitor structural integrity, and determine necessary maintenance or repair works to prevent failures and ensure continued safe operation of the rail network. An Earthwork examination shall be sufficient to identify or determine and record information to enable Network Rail to manage the safety and performance of the Earthwork in accordance with NR/L3/CIV/065. Asset types to be examined: • Earthworks (as defined by NR/L3/CIV/065): Five chain lengths of Earthwork slope: a soil cutting, rock cutting embankment, or natural slope • Coastal and Estuarine Defences that are formed of earthworks: A Structure that protects railway infrastructure against erosion or flooding by tidal waters. It includes protection works, which protect land against erosion and encroachment by such waters, and which perform no flood defence role; and defences, which protect against flooding or attack by such waters. • Outside Party Slopes, whose failure may impact on Network Rail infr … [preview; original evidence retained]
Notice / signal type
AWARD
Publication
2026-09-18T15:40:36+01:00
Event date (when retained)
UNKNOWN
Deadline
UNKNOWN
Retained verification / observation clock — no new source check implied
2026-10-09T14:00:28+00:00
Location
UNKNOWN
Published value / budget / rate
UNKNOWN
Value meaning
TOTAL_NOTICE_NOT_PURA_ADDRESSABLE
Original reference
088822-2026
Exact proposed next action
NO GO
Responsible project for source / qualification reporting
P016
Intended delivery project / receiver — acceptance unverified
P016

Retained source reference: https://www.find-tender.service.gov.uk/Notice/088822-2026

Published value is not Pura revenue or an authorised commitment. Source status is separate from owner approval and receiver execution.

ACTION OWNER: ANDREW
ANDREW ACTION: NO GO

STATUS
Owner review
OPPORTUNITY SCORE
0/100 · Research Required
ESTIMATED VALUE
Not published
DEADLINE
Not published
PROCUREMENT / ENGAGEMENT STAGE
Competitive flexible procedure
ROUTE
Research — verify participation route
LAST VERIFIED
9 Oct 2026 · 15:00 BST
NEXT ACTION

Retain this record for reference; do not pursue it.

CURRENT STAGE: Owner review
WHAT HAPPENED: Radar last recorded source evidence.
WHAT IS HAPPENING NOW: Owner review
ACTION OWNER: ANDREW
BLOCKER: Detailed buyer requirements need confirmation. · Evidence confidence is not yet sufficient. · The participation route needs verification. · Permission for direct contact needs confirmation. · Procurement contact restrictions need checking. · The buyer contact needs verification. · The Pura proposition needs review. · The required response is not yet ready. · A previous contact or duplicate check needs review. · The current owner decision or buyer state prevents contact. · An approved sender must be verified. · Applicable participation requirements need checking. · The opportunity needs current source verification. · The opportunity is below the automatic-eligibility threshold. · A permitted direct contact route is not yet verified.
NEXT ACTION: Retain this record for reference; do not pursue it.
UNAPPROVED · LAPSED

WHAT THE BUYER SAYS THEY NEED

Civil examinations within Network Rail refer to the inspection, examination and reporting of structural assets to ensure the safety, reliability, and longevity of railway infrastructure. These examinations help identify defects, monitor structural integrity, and determine necessary maintenance or repair works to prevent failures and ensure continued safe operation of the rail network. An Earthwork examination shall be sufficient to identify or determine and record information to enable Network Rail to manage the safety and performance of the Earthwork in accordance with NR/L3/CIV/065. Asset types to be examined: • Earthworks (as defined by NR…

KEY PUBLISHED FACTS

  • Contact email: wandwrouteprocurement@networkrail.co.uk
  • Recorded contact: wandwrouteprocurement@networkrail.co.uk

Published route is closed, inactive, withdrawn or already awarded.

WHY RADAR THINKS PURA MAY FIT

Physical works or professional services are required. References to systems, portals or audit trails do not establish a software opportunity. This is a Pura hypothesis; detailed scope, delivery capability and procurement constraints still need checking.

Confidence: MEDIUM — notice scope only

Known: the saved buyer requirement above.
Inferred: potential Pura capability match; not buyer-confirmed.

What still needs checking

  • Detailed workflows and acceptance criteria
  • Integration and security requirements
  • Direct contact permission and procurement constraints
  • Proof effort and bounded paid discovery acceptance

PROGRESS

  1. DISCOVERED
  2. VERIFIED
  3. OWNER REVIEW
  4. APPROVED
  5. RESEARCHING
  6. REQUIREMENT RECONSTRUCTED
  7. PROOF DECISION
  8. PROOF BUILDING
  9. PROOF QA
  10. PROOF READY
  11. CONTACT READY
  12. OWNER SEND GATE
  13. SENT
  14. WAITING FOR RESPONSE
  15. RESPONSE RECEIVED
  16. COMMERCIAL CONVERSATION
  17. WON / LOST

Current stage is highlighted. Other stages are possible steps, not a claim they have happened.

ACTIVITY

  1. — Radar last recorded source evidence.
  2. — Radar discovered the opportunity.

HUMAN CHECK

Official source available: YES
Radar fully expanded source: YES

Key facts verified: contact, route, stage — according to saved evidence; check current source.

Outstanding verification

  • Detailed workflows and acceptance criteria
  • Integration and security requirements
  • Direct contact permission and procurement constraints
  • Proof effort and bounded paid discovery acceptance

Last verification: 9 Oct 2026 · 15:00 BST

OPEN OFFICIAL SOURCEFind a Tender ↗

WHY THIS SCORE?

ComponentEarned / maximum
Buyer need clarity0 / 20
Route & contactability0 / 15
Pura capability fit0 / 15
Time to value0 / 15
Proof speed0 / 10
Evidence confidence0 / 10
Urgency0 / 10
Commercial value0 / 5

WHAT WOULD INCREASE THE SCORE

Obtain stronger evidence for: Buyer need clarity, Route & contactability, Pura capability fit, Time to value, Proof speed, Evidence confidence, Urgency, Commercial value.

WHAT IS HOLDING IT BACK

Not ranked as current work: LAPSED. Historical evidence is retained; current source confirmation is required.

OPPORTUNITY STRENGTH

34 / 100

How commercially interesting the buyer requirement appears.

PURSUIT READINESS

10 / 100

How ready Pura is to act on it now.

Recorded diagnostic assessment; separate from the production opportunity score. Reassess when evidence changes.

CAN WE CONTACT THEM?

Contact mode: OWNER APPROVAL REQUIRED
Direct contact route: NOT YET VERIFIED
Auto-contact eligible: NO

Eligibility is an indicator only. It does not authorise sending.

Why not yet

TECHNICAL / AUDIT EVIDENCE
{
  "record": {
    "id": "53718747-7709-4f73-9fb0-c9cdcc63f9e8",
    "canonical_key": "commercial-opportunity:v1:3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd",
    "organisation_id": "7eb04e6b-a35d-4e24-b4eb-84456893345f",
    "origin_engine": "TENDER",
    "origin_signal_id": "3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd",
    "relationship_type": "PUBLIC_BUYER",
    "what_happened": "Award notice from NETWORK RAIL INFRASTRUCTURE LIMITED. Relevance is supported by notice evidence.",
    "why_it_matters": "Evidence strength, addressability and route are evaluated independently of relationship.",
    "potential_need": "Asset compliance portal and QR records",
    "current_product_match_json": "[]",
    "capability_match_json": "[{\"capability_id\":\"ASSET_PORTAL_QR\",\"confidence\":\"HIGH\",\"currently_sold\":\"UNKNOWN\",\"name\":\"Asset compliance portal and QR records\"}]",
    "new_product_possibility": "YES",
    "value_truth": "UNKNOWN",
    "value_band": "UNKNOWN",
    "probability": "LOW",
    "urgency": "BACKGROUND",
    "confidence": "HIGH",
    "evidence_json": "{\"independent_identities\":[\"ocds-h6vhtk-059b66\"],\"signal_id\":\"3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd\",\"source\":\"find_a_tender_ocds\"}",
    "facts_json": "{\"award_values\":[{\"amount\":24000000,\"amountGross\":28800000,\"currency\":\"GBP\"},{\"amount\":24000000,\"amountGross\":28800000,\"currency\":\"GBP\"}],\"buyer\":\"NETWORK RAIL INFRASTRUCTURE LIMITED\",\"buyer_reference\":\"Project_44202\",\"contact_email\":\"wandwrouteprocurement@networkrail.co.uk\",\"contact_name\":null,\"contact_restrictions\":[],\"contacts\":[{\"email\":\"wandwrouteprocurement@networkrail.co.uk\",\"organisation\":\"NETWORK RAIL INFRASTRUCTURE LIMITED\"}],\"contract_terms\":[],\"cpv\":[],\"currency\":null,\"days_to_deadline\":null,\"deadline\":null,\"deadline_conflict\":false,\"deadline_kind\":\"PARTICIPATION\",\"deadline_narrative\":\"\",\"deadline_structured\":null,\"deadline_time_unpublished\":false,\"demo_evidence\":[\"Where the outside party is unable to provide a satisfactory management policy for the slope or demonstrate by other means that it is being managed in a satisfactory manner, the slope will, so far as is lawful, be subject to a cyclical examination.\"],\"direct_contact_evidence\":[],\"engagement_route\":\"\",\"estimated_value\":null,\"expansion_scope\":\"Complete official OCDS release; linked restricted documents require separate verification.\",\"extensions\":[],\"fully_expanded\":true,\"geographic_scope\":[],\"hidden_opportunity\":true,\"historical_engagement_evidence\":\"\",\"incumbent_evidence\":[],\"linked_documents\":[],\"lot_count\":1,\"lot_scope\":[{\"description\":null,\"id\":\"1\",\"title\":null,\"value\":null}],\"meeting_evidence\":[],\"notice_type\":\"AWARD\",\"procurement_method\":\"Competitive flexible procedure\",\"procurement_status\":\"complete\",\"publication_date\":\"2026-09-18T15:40:36+01:00\",\"published_corrections\":[],\"published_notice_types\":[],\"published_requirement\":\"Civil examinations within Network Rail refer to the inspection, examination and reporting of structural assets to ensure the safety, reliability, and longevity of railway infrastructure. These examinations help identify defects, monitor structural integrity, and determine necessary maintenance or repair works to prevent failures and ensure continued safe operation of the rail network. An Earthwork examination shall be sufficient to identify or determine and record information to enable Network Rail to manage the safety and performance of the Earthwork in accordance with NR/L3/CIV/065.\\n Asset types to be examined:\\n\\u2022\\tEarthworks (as defined by NR/L3/CIV/065): Five chain lengths of Earthwork slope: a soil cutting, rock cutting embankment, or natural slope\\n\\u2022\\tCoastal and Estuarine Defences that are formed of earthworks: A Structure that protects railway infrastructure against erosion or flooding by tidal waters.  It includes protection works, which protect land against erosion and encroachment by such waters, and which perform no flood defence role; and defences, which protect against flooding or attack by such waters.\\n\\u2022\\tOutside Party Slopes, whose failure may impact on Network Rail infrastructure, where the outside party is unable to provide a satisfactory management policy for the slope, will be, so far as is lawful, be subject to a cyclical examination.\\n\\u2022\\tA cutting, embankment or natural slope, outside of the Network Rail boundary, owned or managed by an outside party, which may impact on Network Rail infrastructure.  Where the outside party is unable to provide a satisfactory management policy for the slope or demonstrate by other means that it is being managed in a satisfactory manner, the slope will, so far as is lawful, be subject to a cyclical examination.\\nExamination Types:\\n\\u2022\\tCyclical Earthwork Examination: These examinations are cyclical in accordance with the Task Schedule or as otherwise instructed by Employer's representative. The scope must adhere to SCHI, SEHI and/or RSHI in accordance with NR/L3/CIV/065\\n\\u2022\\tRapid Response Earthwork Examination: These examinations are for Emergency Situations as required. The scope is as required by Network Rail.\\n\\u2022\\tGeotechnical Incident Report: These examinations are as required by Network Rail. The scope is in accordance with NR/L3/CIV/185. \\nEach Examination of an earthwork shall:\\n\\u2022\\tInclude the production of a report.\\n\\u2022\\tInclude an examination to record and report the findings related to the condition of the earthworks including all necessary preparations and arrangements for access to the earthwork. \\n\\u2022\\tUpdate and record data obtained during the examinations in the Network Rail Earthworks Database using Network Rail Earthworks Examination Software.   \\n\\u2022\\tSupport the Employer\\u2019s Representative in the management and co-ordination of examination of earthworks.  \\n\\u2022\\tInclude any vegetation clearance necessary to enable examinations of earthwork. \\n\\u2022\\tProvide a rapid response service to attend and report on earthwork failures and Geotechnical incidents in accordance with NR/L3/CIV/065 and NR/L3/CIV/185.\\nIn the later years of this Framework, the Geotech teams plan to move to non-traditional methods of examination. By integrating satellite data into core processes, and other observed data sets, the business can significantly reduce its reliance on traditional on-site examinations, enhancing efficiency and improving asset management decisions. Based on currently available information we are expecing the following: \\n\\u2022\\tCP7 Y4 50% reduction in Condition A-C assets excluding rock cuttings\\n\\u2022\\tCP7 Y5 70% reduction in Condition A-C assets excluding rock cuttings\",\"questionnaire_evidence\":[],\"reference\":\"088822-2026\",\"registration_evidence\":[],\"relevance_evidence\":{\"ASSET_PORTAL_QR\":[\"asset management\",\"software\"]},\"requirement_items\":\"\",\"selection_requirements\":[],\"sme_suitability\":[],\"submission_method\":\"UNKNOWN\",\"value_excluding_vat\":null,\"value_including_vat\":null,\"value_minimum\":null,\"value_scope\":\"TOTAL_NOTICE_NOT_PURA_ADDRESSABLE\",\"vat_basis\":\"\"}",
    "inferences_json": "[{\"basis\":{\"ASSET_PORTAL_QR\":[\"asset management\",\"software\"]},\"type\":\"HIDDEN_ADDRESSABLE_ELEMENT\"}]",
    "unknowns_json": "[\"deadline\",\"estimated_value\"]",
    "recommended_action": "VERIFY AWARDED LOT / SUBCONTRACT TERMS",
    "route_to_market": "RESEARCH",
    "time_to_revenue": "UNKNOWN",
    "ranking_json": "{\"delivery_fit\":3,\"effort\":2,\"evidence_confidence\":3,\"probability\":1,\"relationship_leverage\":1,\"repeatability\":1,\"risk_adjusted\":6,\"time_to_revenue\":0,\"value\":0}",
    "status": "BACKGROUND",
    "feedback_state": "NONE",
    "related_signals_json": "[\"3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd\"]",
    "related_tenders_json": "[\"3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd\"]",
    "related_contracts_json": "[]",
    "provenance_json": "{\"derivation\":\"opportunity-evidence-v2\",\"parent_signal\":\"3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd\"}",
    "data_mode": "LIVE",
    "content_digest": "60307a9753f1a717e92e61c0b8b63e71084e69346bfb951cd25a5886cd6c85e6",
    "created_at": "2026-09-18T15:00:26+00:00",
    "updated_at": "2026-11-05T02:01:16+00:00",
    "opportunity_kind": "COMPANY_SPECIFIC",
    "addressability": "PARTIALLY_ADDRESSABLE",
    "total_value_truth": "UNKNOWN",
    "total_value_band": "UNKNOWN",
    "total_value_min": null,
    "total_value_max": null,
    "total_value_currency": null,
    "addressable_value_truth": "UNKNOWN",
    "addressable_value_band": "UNKNOWN",
    "addressable_value_min": null,
    "addressable_value_max": null,
    "addressable_value_currency": null,
    "evidence_identity_count": 1,
    "event_count": 1,
    "organisation_count": 1,
    "source_count": 1,
    "first_evidence_at": "2026-09-18T14:40:36+00:00",
    "last_evidence_at": "2026-09-18T14:40:36+00:00",
    "evidence_recency": "AGING",
    "contradictory_evidence_json": "[]",
    "promotion_evidence_json": "[\"partner plausibility UNPROVEN: explicit supplier willingness and subcontract route required\"]",
    "kill_evidence_json": "[\"source evidence withdrawn\",\"commercial fit contradicted\",\"route proven impossible\"]",
    "recurring_revenue_type": "UNKNOWN",
    "organisation": "NETWORK RAIL INFRASTRUCTURE LIMITED"
  },
  "signals": [
    {
      "id": "3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd",
      "canonical_key": "find_a_tender_ocds:088822-2026",
      "engine": "TENDER",
      "organisation_id": "7eb04e6b-a35d-4e24-b4eb-84456893345f",
      "signal_type": "AWARD",
      "title": "Wales & Western - Civils Examination Services (Earthworks)",
      "summary": "Award notice from NETWORK RAIL INFRASTRUCTURE LIMITED. Relevance is supported by notice evidence.",
      "observed_at": "2026-10-09T14:00:28+00:00",
      "event_at": "2026-09-18T15:40:36+01:00",
      "source_id": "find_a_tender_ocds",
      "source_reference": "088822-2026",
      "source_url": "https://www.find-tender.service.gov.uk/Notice/088822-2026",
      "source_permission": "PERMITTED_WITH_CONDITIONS",
      "facts_json": "{\"award_values\":[{\"amount\":24000000,\"amountGross\":28800000,\"currency\":\"GBP\"},{\"amount\":24000000,\"amountGross\":28800000,\"currency\":\"GBP\"}],\"buyer\":\"NETWORK RAIL INFRASTRUCTURE LIMITED\",\"buyer_reference\":\"Project_44202\",\"contact_email\":\"wandwrouteprocurement@networkrail.co.uk\",\"contact_name\":null,\"contact_restrictions\":[],\"contacts\":[{\"email\":\"wandwrouteprocurement@networkrail.co.uk\",\"organisation\":\"NETWORK RAIL INFRASTRUCTURE LIMITED\"}],\"contract_terms\":[],\"cpv\":[],\"currency\":null,\"days_to_deadline\":null,\"deadline\":null,\"deadline_conflict\":false,\"deadline_kind\":\"PARTICIPATION\",\"deadline_narrative\":\"\",\"deadline_structured\":null,\"deadline_time_unpublished\":false,\"demo_evidence\":[\"Where the outside party is unable to provide a satisfactory management policy for the slope or demonstrate by other means that it is being managed in a satisfactory manner, the slope will, so far as is lawful, be subject to a cyclical examination.\"],\"direct_contact_evidence\":[],\"engagement_route\":\"\",\"estimated_value\":null,\"expansion_scope\":\"Complete official OCDS release; linked restricted documents require separate verification.\",\"extensions\":[],\"fully_expanded\":true,\"geographic_scope\":[],\"hidden_opportunity\":true,\"historical_engagement_evidence\":\"\",\"incumbent_evidence\":[],\"linked_documents\":[],\"lot_count\":1,\"lot_scope\":[{\"description\":null,\"id\":\"1\",\"title\":null,\"value\":null}],\"meeting_evidence\":[],\"notice_type\":\"AWARD\",\"procurement_method\":\"Competitive flexible procedure\",\"procurement_status\":\"complete\",\"publication_date\":\"2026-09-18T15:40:36+01:00\",\"published_corrections\":[],\"published_notice_types\":[],\"published_requirement\":\"Civil examinations within Network Rail refer to the inspection, examination and reporting of structural assets to ensure the safety, reliability, and longevity of railway infrastructure. These examinations help identify defects, monitor structural integrity, and determine necessary maintenance or repair works to prevent failures and ensure continued safe operation of the rail network. An Earthwork examination shall be sufficient to identify or determine and record information to enable Network Rail to manage the safety and performance of the Earthwork in accordance with NR/L3/CIV/065.\\n Asset types to be examined:\\n\\u2022\\tEarthworks (as defined by NR/L3/CIV/065): Five chain lengths of Earthwork slope: a soil cutting, rock cutting embankment, or natural slope\\n\\u2022\\tCoastal and Estuarine Defences that are formed of earthworks: A Structure that protects railway infrastructure against erosion or flooding by tidal waters.  It includes protection works, which protect land against erosion and encroachment by such waters, and which perform no flood defence role; and defences, which protect against flooding or attack by such waters.\\n\\u2022\\tOutside Party Slopes, whose failure may impact on Network Rail infrastructure, where the outside party is unable to provide a satisfactory management policy for the slope, will be, so far as is lawful, be subject to a cyclical examination.\\n\\u2022\\tA cutting, embankment or natural slope, outside of the Network Rail boundary, owned or managed by an outside party, which may impact on Network Rail infrastructure.  Where the outside party is unable to provide a satisfactory management policy for the slope or demonstrate by other means that it is being managed in a satisfactory manner, the slope will, so far as is lawful, be subject to a cyclical examination.\\nExamination Types:\\n\\u2022\\tCyclical Earthwork Examination: These examinations are cyclical in accordance with the Task Schedule or as otherwise instructed by Employer's representative. The scope must adhere to SCHI, SEHI and/or RSHI in accordance with NR/L3/CIV/065\\n\\u2022\\tRapid Response Earthwork Examination: These examinations are for Emergency Situations as required. The scope is as required by Network Rail.\\n\\u2022\\tGeotechnical Incident Report: These examinations are as required by Network Rail. The scope is in accordance with NR/L3/CIV/185. \\nEach Examination of an earthwork shall:\\n\\u2022\\tInclude the production of a report.\\n\\u2022\\tInclude an examination to record and report the findings related to the condition of the earthworks including all necessary preparations and arrangements for access to the earthwork. \\n\\u2022\\tUpdate and record data obtained during the examinations in the Network Rail Earthworks Database using Network Rail Earthworks Examination Software.   \\n\\u2022\\tSupport the Employer\\u2019s Representative in the management and co-ordination of examination of earthworks.  \\n\\u2022\\tInclude any vegetation clearance necessary to enable examinations of earthwork. \\n\\u2022\\tProvide a rapid response service to attend and report on earthwork failures and Geotechnical incidents in accordance with NR/L3/CIV/065 and NR/L3/CIV/185.\\nIn the later years of this Framework, the Geotech teams plan to move to non-traditional methods of examination. By integrating satellite data into core processes, and other observed data sets, the business can significantly reduce its reliance on traditional on-site examinations, enhancing efficiency and improving asset management decisions. Based on currently available information we are expecing the following: \\n\\u2022\\tCP7 Y4 50% reduction in Condition A-C assets excluding rock cuttings\\n\\u2022\\tCP7 Y5 70% reduction in Condition A-C assets excluding rock cuttings\",\"questionnaire_evidence\":[],\"reference\":\"088822-2026\",\"registration_evidence\":[],\"relevance_evidence\":{\"ASSET_PORTAL_QR\":[\"asset management\",\"software\"]},\"requirement_items\":\"\",\"selection_requirements\":[],\"sme_suitability\":[],\"submission_method\":\"UNKNOWN\",\"value_excluding_vat\":null,\"value_including_vat\":null,\"value_minimum\":null,\"value_scope\":\"TOTAL_NOTICE_NOT_PURA_ADDRESSABLE\",\"vat_basis\":\"\"}",
      "inferences_json": "[{\"basis\":{\"ASSET_PORTAL_QR\":[\"asset management\",\"software\"]},\"type\":\"HIDDEN_ADDRESSABLE_ELEMENT\"}]",
      "unknowns_json": "[\"deadline\",\"estimated_value\"]",
      "confidence": "HIGH",
      "relevant_services_json": "[{\"confidence\":\"HIGH\",\"rationale\":\"asset management, software\",\"service\":\"ASSET_PORTAL_QR\"}]",
      "value_truth": "UNKNOWN",
      "value_band": "UNKNOWN",
      "value_min": null,
      "value_max": null,
      "value_currency": null,
      "urgency": "BACKGROUND",
      "priority": "WATCH",
      "recommended_action": "TRACK UNTIL TENDER",
      "status": "OPEN",
      "notification_state": "NOT_ELIGIBLE",
      "feedback_state": "NONE",
      "provenance_json": "{\"licence\":\"http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/\",\"ocid\":\"ocds-h6vhtk-059b66\",\"release_id\":\"088822-2026\"}",
      "data_mode": "LIVE",
      "content_digest": "30074434ddda52418b2dbea312325519f26540820f4aa8b0ddf23fd8466eca8c",
      "created_at": "2026-09-18T15:00:25+00:00",
      "updated_at": "2026-10-09T14:00:28+00:00"
    }
  ],
  "classification_history": [
    {
      "event_type": "DISCOVERED",
      "previous_status": null,
      "new_status": "BACKGROUND",
      "occurred_at": "2026-09-18T15:00:26+00:00",
      "reason_json": "{\"kill\":[\"source evidence withdrawn\",\"commercial fit contradicted\",\"route proven impossible\"],\"promotion\":[\"partner plausibility UNPROVEN: explicit supplier willingness and subcontract route required\"]}"
    }
  ],
  "feedback_history": [],
  "qualified_projection": {
    "id": "53718747-7709-4f73-9fb0-c9cdcc63f9e8",
    "canonical_key": "commercial-opportunity:v1:3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd",
    "organisation_id": "7eb04e6b-a35d-4e24-b4eb-84456893345f",
    "origin_engine": "TENDER",
    "origin_signal_id": "3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd",
    "relationship_type": "PUBLIC_BUYER",
    "what_happened": "Award notice from NETWORK RAIL INFRASTRUCTURE LIMITED. Relevance is supported by notice evidence.",
    "why_it_matters": "Evidence strength, addressability and route are evaluated independently of relationship.",
    "potential_need": "Asset compliance portal and QR records",
    "current_product_match_json": "[]",
    "capability_match_json": "[{\"capability_id\":\"ASSET_PORTAL_QR\",\"confidence\":\"HIGH\",\"currently_sold\":\"UNKNOWN\",\"name\":\"Asset compliance portal and QR records\"}]",
    "new_product_possibility": "YES",
    "value_truth": "UNKNOWN",
    "value_band": "UNKNOWN",
    "probability": "LOW",
    "urgency": "BACKGROUND",
    "confidence": "MEDIUM — notice scope only",
    "evidence_json": "{\"independent_identities\":[\"ocds-h6vhtk-059b66\"],\"signal_id\":\"3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd\",\"source\":\"find_a_tender_ocds\"}",
    "facts_json": "{\"award_values\":[{\"amount\":24000000,\"amountGross\":28800000,\"currency\":\"GBP\"},{\"amount\":24000000,\"amountGross\":28800000,\"currency\":\"GBP\"}],\"buyer\":\"NETWORK RAIL INFRASTRUCTURE LIMITED\",\"buyer_reference\":\"Project_44202\",\"contact_email\":\"wandwrouteprocurement@networkrail.co.uk\",\"contact_name\":null,\"contact_restrictions\":[],\"contacts\":[{\"email\":\"wandwrouteprocurement@networkrail.co.uk\",\"organisation\":\"NETWORK RAIL INFRASTRUCTURE LIMITED\"}],\"contract_terms\":[],\"cpv\":[],\"currency\":null,\"days_to_deadline\":null,\"deadline\":null,\"deadline_conflict\":false,\"deadline_kind\":\"PARTICIPATION\",\"deadline_narrative\":\"\",\"deadline_structured\":null,\"deadline_time_unpublished\":false,\"demo_evidence\":[\"Where the outside party is unable to provide a satisfactory management policy for the slope or demonstrate by other means that it is being managed in a satisfactory manner, the slope will, so far as is lawful, be subject to a cyclical examination.\"],\"direct_contact_evidence\":[],\"engagement_route\":\"\",\"estimated_value\":null,\"expansion_scope\":\"Complete official OCDS release; linked restricted documents require separate verification.\",\"extensions\":[],\"fully_expanded\":true,\"geographic_scope\":[],\"hidden_opportunity\":true,\"historical_engagement_evidence\":\"\",\"incumbent_evidence\":[],\"linked_documents\":[],\"lot_count\":1,\"lot_scope\":[{\"description\":null,\"id\":\"1\",\"title\":null,\"value\":null}],\"meeting_evidence\":[],\"notice_type\":\"AWARD\",\"procurement_method\":\"Competitive flexible procedure\",\"procurement_status\":\"complete\",\"publication_date\":\"2026-09-18T15:40:36+01:00\",\"published_corrections\":[],\"published_notice_types\":[],\"published_requirement\":\"Civil examinations within Network Rail refer to the inspection, examination and reporting of structural assets to ensure the safety, reliability, and longevity of railway infrastructure. These examinations help identify defects, monitor structural integrity, and determine necessary maintenance or repair works to prevent failures and ensure continued safe operation of the rail network. An Earthwork examination shall be sufficient to identify or determine and record information to enable Network Rail to manage the safety and performance of the Earthwork in accordance with NR/L3/CIV/065.\\n Asset types to be examined:\\n\\u2022\\tEarthworks (as defined by NR/L3/CIV/065): Five chain lengths of Earthwork slope: a soil cutting, rock cutting embankment, or natural slope\\n\\u2022\\tCoastal and Estuarine Defences that are formed of earthworks: A Structure that protects railway infrastructure against erosion or flooding by tidal waters.  It includes protection works, which protect land against erosion and encroachment by such waters, and which perform no flood defence role; and defences, which protect against flooding or attack by such waters.\\n\\u2022\\tOutside Party Slopes, whose failure may impact on Network Rail infrastructure, where the outside party is unable to provide a satisfactory management policy for the slope, will be, so far as is lawful, be subject to a cyclical examination.\\n\\u2022\\tA cutting, embankment or natural slope, outside of the Network Rail boundary, owned or managed by an outside party, which may impact on Network Rail infrastructure.  Where the outside party is unable to provide a satisfactory management policy for the slope or demonstrate by other means that it is being managed in a satisfactory manner, the slope will, so far as is lawful, be subject to a cyclical examination.\\nExamination Types:\\n\\u2022\\tCyclical Earthwork Examination: These examinations are cyclical in accordance with the Task Schedule or as otherwise instructed by Employer's representative. The scope must adhere to SCHI, SEHI and/or RSHI in accordance with NR/L3/CIV/065\\n\\u2022\\tRapid Response Earthwork Examination: These examinations are for Emergency Situations as required. The scope is as required by Network Rail.\\n\\u2022\\tGeotechnical Incident Report: These examinations are as required by Network Rail. The scope is in accordance with NR/L3/CIV/185. \\nEach Examination of an earthwork shall:\\n\\u2022\\tInclude the production of a report.\\n\\u2022\\tInclude an examination to record and report the findings related to the condition of the earthworks including all necessary preparations and arrangements for access to the earthwork. \\n\\u2022\\tUpdate and record data obtained during the examinations in the Network Rail Earthworks Database using Network Rail Earthworks Examination Software.   \\n\\u2022\\tSupport the Employer\\u2019s Representative in the management and co-ordination of examination of earthworks.  \\n\\u2022\\tInclude any vegetation clearance necessary to enable examinations of earthwork. \\n\\u2022\\tProvide a rapid response service to attend and report on earthwork failures and Geotechnical incidents in accordance with NR/L3/CIV/065 and NR/L3/CIV/185.\\nIn the later years of this Framework, the Geotech teams plan to move to non-traditional methods of examination. By integrating satellite data into core processes, and other observed data sets, the business can significantly reduce its reliance on traditional on-site examinations, enhancing efficiency and improving asset management decisions. Based on currently available information we are expecing the following: \\n\\u2022\\tCP7 Y4 50% reduction in Condition A-C assets excluding rock cuttings\\n\\u2022\\tCP7 Y5 70% reduction in Condition A-C assets excluding rock cuttings\",\"questionnaire_evidence\":[],\"reference\":\"088822-2026\",\"registration_evidence\":[],\"relevance_evidence\":{\"ASSET_PORTAL_QR\":[\"asset management\",\"software\"]},\"requirement_items\":\"\",\"selection_requirements\":[],\"sme_suitability\":[],\"submission_method\":\"UNKNOWN\",\"value_excluding_vat\":null,\"value_including_vat\":null,\"value_minimum\":null,\"value_scope\":\"TOTAL_NOTICE_NOT_PURA_ADDRESSABLE\",\"vat_basis\":\"\"}",
    "inferences_json": "[{\"basis\":{\"ASSET_PORTAL_QR\":[\"asset management\",\"software\"]},\"type\":\"HIDDEN_ADDRESSABLE_ELEMENT\"}]",
    "unknowns_json": "[\"deadline\",\"estimated_value\"]",
    "recommended_action": "VERIFY AWARDED LOT / SUBCONTRACT TERMS",
    "route_to_market": "RESEARCH",
    "time_to_revenue": "UNKNOWN",
    "ranking_json": "{\"delivery_fit\":3,\"effort\":2,\"evidence_confidence\":3,\"probability\":1,\"relationship_leverage\":1,\"repeatability\":1,\"risk_adjusted\":6,\"time_to_revenue\":0,\"value\":0}",
    "status": "BACKGROUND",
    "feedback_state": "NONE",
    "related_signals_json": "[\"3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd\"]",
    "related_tenders_json": "[\"3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd\"]",
    "related_contracts_json": "[]",
    "provenance_json": "{\"derivation\":\"opportunity-evidence-v2\",\"parent_signal\":\"3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd\"}",
    "data_mode": "LIVE",
    "content_digest": "60307a9753f1a717e92e61c0b8b63e71084e69346bfb951cd25a5886cd6c85e6",
    "created_at": "2026-09-18T15:00:26+00:00",
    "updated_at": "2026-11-05T02:01:16+00:00",
    "opportunity_kind": "COMPANY_SPECIFIC",
    "addressability": "PARTIALLY_ADDRESSABLE",
    "total_value_truth": "UNKNOWN",
    "total_value_band": "UNKNOWN",
    "total_value_min": null,
    "total_value_max": null,
    "total_value_currency": null,
    "addressable_value_truth": "UNKNOWN",
    "addressable_value_band": "UNKNOWN",
    "addressable_value_min": null,
    "addressable_value_max": null,
    "addressable_value_currency": null,
    "evidence_identity_count": 1,
    "event_count": 1,
    "organisation_count": 1,
    "source_count": 1,
    "first_evidence_at": "2026-09-18T14:40:36+00:00",
    "last_evidence_at": "2026-09-18T14:40:36+00:00",
    "evidence_recency": "AGING",
    "contradictory_evidence_json": "[]",
    "promotion_evidence_json": "[\"partner plausibility UNPROVEN: explicit supplier willingness and subcontract route required\"]",
    "kill_evidence_json": "[\"source evidence withdrawn\",\"commercial fit contradicted\",\"route proven impossible\"]",
    "recurring_revenue_type": "UNKNOWN",
    "organisation": "NETWORK RAIL INFRASTRUCTURE LIMITED",
    "FACT": {
      "published_requirement": "Civil examinations within Network Rail refer to the inspection, examination and reporting of structural assets to ensure the safety, reliability, and longevity of railway infrastructure. These examinations help identify defects, monitor structural integrity, and determine necessary maintenance or repair works to prevent failures and ensure continued safe operation of the rail network. An Earthwork examination shall be sufficient to identify or determine and record information to enable Network Rail to manage the safety and performance of the Earthwork in accordance with NR/L3/CIV/065.\n Asset types to be examined:\n•\tEarthworks (as defined by NR/L3/CIV/065): Five chain lengths of Earthwork slope: a soil cutting, rock cutting embankment, or natural slope\n•\tCoastal and Estuarine Defences that are formed of earthworks: A Structure that protects railway infrastructure against erosion or flooding by tidal waters.  It includes protection works, which protect land against erosion and encroachment by such waters, and which perform no flood defence role; and defences, which protect against flooding or attack by such waters.\n•\tOutside Party Slopes, whose failure may impact on Network Rail infrastructure, where the outside party is unable to provide a satisfactory management policy for the slope, will be, so far as is lawful, be subject to a cyclical examination.\n•\tA cutting, embankment or natural slope, outside of the Network Rail boundary, owned or managed by an outside party, which may impact on Network Rail infrastructure.  Where the outside party is unable to provide a satisfactory management policy for the slope or demonstrate by other means that it is being managed in a satisfactory manner, the slope will, so far as is lawful, be subject to a cyclical examination.\nExamination Types:\n•\tCyclical Earthwork Examination: These examinations are cyclical in accordance with the Task Schedule or as otherwise instructed by Employer's representative. The scope must adhere to SCHI, SEHI and/or RSHI in accordance with NR/L3/CIV/065\n•\tRapid Response Earthwork Examination: These examinations are for Emergency Situations as required. The scope is as required by Network Rail.\n•\tGeotechnical Incident Report: These examinations are as required by Network Rail. The scope is in accordance with NR/L3/CIV/185. \nEach Examination of an earthwork shall:\n•\tInclude the production of a report.\n•\tInclude an examination to record and report the findings related to the condition of the earthworks including all necessary preparations and arrangements for access to the earthwork. \n•\tUpdate and record data obtained during the examinations in the Network Rail Earthworks Database using Network Rail Earthworks Examination Software.   \n•\tSupport the Employer’s Representative in the management and co-ordination of examination of earthworks.  \n•\tInclude any vegetation clearance necessary to enable examinations of earthwork. \n•\tProvide a rapid response service to attend and report on earthwork failures and Geotechnical incidents in accordance with NR/L3/CIV/065 and NR/L3/CIV/185.\nIn the later years of this Framework, the Geotech teams plan to move to non-traditional methods of examination. By integrating satellite data into core processes, and other observed data sets, the business can significantly reduce its reliance on traditional on-site examinations, enhancing efficiency and improving asset management decisions. Based on currently available information we are expecing the following: \n•\tCP7 Y4 50% reduction in Condition A-C assets excluding rock cuttings\n•\tCP7 Y5 70% reduction in Condition A-C assets excluding rock cuttings",
      "notice_title": "Wales & Western - Civils Examination Services (Earthworks)",
      "requirement_items": "",
      "procurement_method": "Competitive flexible procedure",
      "deadline": null,
      "publication_date": "2026-09-18T15:40:36+01:00",
      "notice_type": "AWARD",
      "source_url": "https://www.find-tender.service.gov.uk/Notice/088822-2026"
    },
    "SUPPORTED_INFERENCE": {
      "Pura_match_hypothesis": "Physical works or professional services are required. References to systems, portals or audit trails do not establish a software opportunity."
    },
    "UNKNOWN": [
      "Detailed workflows and acceptance criteria",
      "Integration and security requirements",
      "Direct contact permission and procurement constraints",
      "Proof effort and bounded paid discovery acceptance"
    ],
    "reconstruction_state": "BOUNDED_NOTICE_REVIEW",
    "commercially_qualified_solution": false,
    "route_class": "NO_GO",
    "recommendation": "NO GO",
    "proof_opportunity": "UNKNOWN — reconstruct detailed buyer workflow before selecting a proof",
    "proof_effort": "UNKNOWN",
    "commercial_entry": "Proposed bounded discovery; scope and buyer acceptance UNKNOWN",
    "contactability": "Published procurement route only; direct buyer contact UNKNOWN",
    "category": "TENDER",
    "fit_review": {
      "factors": {
        "requirement_clarity": 0.65,
        "contactability": 0.25,
        "capability_fit": 0.2,
        "evidence_confidence": 0.85,
        "urgency": 0,
        "commercial_value": 0,
        "time_to_cash": 0,
        "proof_effort": 0
      },
      "classification": "PHYSICAL_SERVICE",
      "fit_reason": "Physical works or professional services are required. References to systems, portals or audit trails do not establish a software opportunity.",
      "diagnostic_scores": {
        "opportunity_strength": 34,
        "pursuit_readiness": 10
      },
      "strength_components": {
        "need_clarity": 8,
        "procurement_seriousness": 8,
        "commercial_value": 0,
        "timing": 0,
        "capability_relevance": 8,
        "evidence_confidence": 10
      },
      "readiness_components": {
        "contactability": 10,
        "route_clarity": 0,
        "deadline_clarity": 0,
        "proof_readiness": 0,
        "proposition_readiness": 0,
        "procurement_restrictions": 0,
        "response_mechanism": 0
      }
    },
    "freshness": "LAPSED",
    "freshness_reason": "Published route is closed, inactive, withdrawn or already awarded.",
    "evidence_at": "2026-10-09T14:00:28+00:00",
    "contact_evidence": {
      "requirement_complete": false,
      "high_confidence": false
    },
    "verified_route": "UNKNOWN",
    "contact_model": {
      "AUTO_CONTACT_ELIGIBLE": false,
      "contact_mode": "OWNER APPROVAL REQUIRED",
      "threshold": 80,
      "gates": {
        "requirement_complete": false,
        "high_confidence": false,
        "buyer_route_verified": false,
        "direct_contact_permitted": false,
        "procurement_allows_contact": false,
        "identity_verified": false,
        "proposition_ready": false,
        "required_response_ready": false,
        "no_duplicate_contact": false,
        "no_negative_state": false,
        "approved_sender_available": false,
        "jurisdiction_satisfied": false,
        "live": false,
        "score": false,
        "direct_route": false
      },
      "blockers": [
        "requirement_complete",
        "high_confidence",
        "buyer_route_verified",
        "direct_contact_permitted",
        "procurement_allows_contact",
        "identity_verified",
        "proposition_ready",
        "required_response_ready",
        "no_duplicate_contact",
        "no_negative_state",
        "approved_sender_available",
        "jurisdiction_satisfied",
        "live",
        "score",
        "direct_route"
      ],
      "send_authorised": false
    },
    "owner_state": "UNAPPROVED",
    "decision_at": null,
    "decision_hash": "5fad70c07e7aa6cb098634307580d69ebee7b354650d30b4c8d376adb8f15226",
    "score": 0,
    "score_factors": {
      "live_need": 0,
      "requirement_clarity": 0.65,
      "contactability": 0.25,
      "evidence_confidence": 0.85,
      "capability_fit": 0.2,
      "urgency": 0,
      "commercial_value": 0,
      "time_to_cash": 0,
      "proof_effort": 0
    },
    "quick_win": false,
    "evidence_digest": "5fad70c07e7aa6cb098634307580d69ebee7b354650d30b4c8d376adb8f15226",
    "route": "https://www.find-tender.service.gov.uk/Notice/088822-2026"
  },
  "source_urls_used": [
    {
      "url": "https://www.find-tender.service.gov.uk/Notice/088822-2026",
      "name": "Find a Tender",
      "reference": "088822-2026",
      "published": "2026-09-18T15:40:36+01:00",
      "checked": "2026-10-09T14:00:28+00:00",
      "unavailable": false
    }
  ],
  "lifecycle_audit": {
    "owner_actions": [],
    "owner_decision": null,
    "requirement_reconstructions": []
  }
}
RETAINED WORKSPACE / PREPARED PACKAGE
TENDER · BACKGROUND · PARTIALLY_ADDRESSABLE

NETWORK RAIL INFRASTRUCTURE LIMITED

WHY THIS IS HERE

Award notice from NETWORK RAIL INFRASTRUCTURE LIMITED. Relevance is supported by notice evidence.

Evidence strength, addressability and route are evaluated independently of relationship.

PURA FIT

[{"capability_id":"ASSET_PORTAL_QR","confidence":"HIGH","currently_sold":"UNKNOWN","name":"Asset compliance portal and QR records"}]
Total procurement value
UNKNOWN · UNKNOWN · None
Pura-addressable value
UNKNOWN · UNKNOWN · None
Route
RESEARCH
Time to revenue
UNKNOWN
Independent evidence
1 identities · 1 sources
Recurring potential
UNKNOWN

UNCERTAINTY

["deadline","estimated_value"]

WHAT WOULD PROMOTE IT

["partner plausibility UNPROVEN: explicit supplier willingness and subcontract route required"]

WHAT WOULD KILL IT

["source evidence withdrawn","commercial fit contradicted","route proven impossible"]

EVIDENCE

[
  {
    "id": "3dc0ed97-11ff-4cb0-be5b-f93e5a03a5bd",
    "canonical_key": "find_a_tender_ocds:088822-2026",
    "engine": "TENDER",
    "organisation_id": "7eb04e6b-a35d-4e24-b4eb-84456893345f",
    "signal_type": "AWARD",
    "title": "Wales & Western - Civils Examination Services (Earthworks)",
    "summary": "Award notice from NETWORK RAIL INFRASTRUCTURE LIMITED. Relevance is supported by notice evidence.",
    "observed_at": "2026-10-09T14:00:28+00:00",
    "event_at": "2026-09-18T15:40:36+01:00",
    "source_id": "find_a_tender_ocds",
    "source_reference": "088822-2026",
    "source_url": "https://www.find-tender.service.gov.uk/Notice/088822-2026",
    "source_permission": "PERMITTED_WITH_CONDITIONS",
    "facts_json": "{\"award_values\":[{\"amount\":24000000,\"amountGross\":28800000,\"currency\":\"GBP\"},{\"amount\":24000000,\"amountGross\":28800000,\"currency\":\"GBP\"}],\"buyer\":\"NETWORK RAIL INFRASTRUCTURE LIMITED\",\"buyer_reference\":\"Project_44202\",\"contact_email\":\"wandwrouteprocurement@networkrail.co.uk\",\"contact_name\":null,\"contact_restrictions\":[],\"contacts\":[{\"email\":\"wandwrouteprocurement@networkrail.co.uk\",\"organisation\":\"NETWORK RAIL INFRASTRUCTURE LIMITED\"}],\"contract_terms\":[],\"cpv\":[],\"currency\":null,\"days_to_deadline\":null,\"deadline\":null,\"deadline_conflict\":false,\"deadline_kind\":\"PARTICIPATION\",\"deadline_narrative\":\"\",\"deadline_structured\":null,\"deadline_time_unpublished\":false,\"demo_evidence\":[\"Where the outside party is unable to provide a satisfactory management policy for the slope or demonstrate by other means that it is being managed in a satisfactory manner, the slope will, so far as is lawful, be subject to a cyclical examination.\"],\"direct_contact_evidence\":[],\"engagement_route\":\"\",\"estimated_value\":null,\"expansion_scope\":\"Complete official OCDS release; linked restricted documents require separate verification.\",\"extensions\":[],\"fully_expanded\":true,\"geographic_scope\":[],\"hidden_opportunity\":true,\"historical_engagement_evidence\":\"\",\"incumbent_evidence\":[],\"linked_documents\":[],\"lot_count\":1,\"lot_scope\":[{\"description\":null,\"id\":\"1\",\"title\":null,\"value\":null}],\"meeting_evidence\":[],\"notice_type\":\"AWARD\",\"procurement_method\":\"Competitive flexible procedure\",\"procurement_status\":\"complete\",\"publication_date\":\"2026-09-18T15:40:36+01:00\",\"published_corrections\":[],\"published_notice_types\":[],\"published_requirement\":\"Civil examinations within Network Rail refer to the inspection, examination and reporting of structural assets to ensure the safety, reliability, and longevity of railway infrastructure. These examinations help identify defects, monitor structural integrity, and determine necessary maintenance or repair works to prevent failures and ensure continued safe operation of the rail network. An Earthwork examination shall be sufficient to identify or determine and record information to enable Network Rail to manage the safety and performance of the Earthwork in accordance with NR/L3/CIV/065.\\n Asset types to be examined:\\n\\u2022\\tEarthworks (as defined by NR/L3/CIV/065): Five chain lengths of Earthwork slope: a soil cutting, rock cutting embankment, or natural slope\\n\\u2022\\tCoastal and Estuarine Defences that are formed of earthworks: A Structure that protects railway infrastructure against erosion or flooding by tidal waters.  It includes protection works, which protect land against erosion and encroachment by such waters, and which perform no flood defence role; and defences, which protect against flooding or attack by such waters.\\n\\u2022\\tOutside Party Slopes, whose failure may impact on Network Rail infrastructure, where the outside party is unable to provide a satisfactory management policy for the slope, will be, so far as is lawful, be subject to a cyclical examination.\\n\\u2022\\tA cutting, embankment or natural slope, outside of the Network Rail boundary, owned or managed by an outside party, which may impact on Network Rail infrastructure.  Where the outside party is unable to provide a satisfactory management policy for the slope or demonstrate by other means that it is being managed in a satisfactory manner, the slope will, so far as is lawful, be subject to a cyclical examination.\\nExamination Types:\\n\\u2022\\tCyclical Earthwork Examination: These examinations are cyclical in accordance with the Task Schedule or as otherwise instructed by Employer's representative. The scope must adhere to SCHI, SEHI and/or RSHI in accordance with NR/L3/CIV/065\\n\\u2022\\tRapid Response Earthwork Examination: These examinations are for Emergency Situations as required. The scope is as required by Network Rail.\\n\\u2022\\tGeotechnical Incident Report: These examinations are as required by Network Rail. The scope is in accordance with NR/L3/CIV/185. \\nEach Examination of an earthwork shall:\\n\\u2022\\tInclude the production of a report.\\n\\u2022\\tInclude an examination to record and report the findings related to the condition of the earthworks including all necessary preparations and arrangements for access to the earthwork. \\n\\u2022\\tUpdate and record data obtained during the examinations in the Network Rail Earthworks Database using Network Rail Earthworks Examination Software.   \\n\\u2022\\tSupport the Employer\\u2019s Representative in the management and co-ordination of examination of earthworks.  \\n\\u2022\\tInclude any vegetation clearance necessary to enable examinations of earthwork. \\n\\u2022\\tProvide a rapid response service to attend and report on earthwork failures and Geotechnical incidents in accordance with NR/L3/CIV/065 and NR/L3/CIV/185.\\nIn the later years of this Framework, the Geotech teams plan to move to non-traditional methods of examination. By integrating satellite data into core processes, and other observed data sets, the business can significantly reduce its reliance on traditional on-site examinations, enhancing efficiency and improving asset management decisions. Based on currently available information we are expecing the following: \\n\\u2022\\tCP7 Y4 50% reduction in Condition A-C assets excluding rock cuttings\\n\\u2022\\tCP7 Y5 70% reduction in Condition A-C assets excluding rock cuttings\",\"questionnaire_evidence\":[],\"reference\":\"088822-2026\",\"registration_evidence\":[],\"relevance_evidence\":{\"ASSET_PORTAL_QR\":[\"asset management\",\"software\"]},\"requirement_items\":\"\",\"selection_requirements\":[],\"sme_suitability\":[],\"submission_method\":\"UNKNOWN\",\"value_excluding_vat\":null,\"value_including_vat\":null,\"value_minimum\":null,\"value_scope\":\"TOTAL_NOTICE_NOT_PURA_ADDRESSABLE\",\"vat_basis\":\"\"}",
    "inferences_json": "[{\"basis\":{\"ASSET_PORTAL_QR\":[\"asset management\",\"software\"]},\"type\":\"HIDDEN_ADDRESSABLE_ELEMENT\"}]",
    "unknowns_json": "[\"deadline\",\"estimated_value\"]",
    "confidence": "HIGH",
    "relevant_services_json": "[{\"confidence\":\"HIGH\",\"rationale\":\"asset management, software\",\"service\":\"ASSET_PORTAL_QR\"}]",
    "value_truth": "UNKNOWN",
    "value_band": "UNKNOWN",
    "value_min": null,
    "value_max": null,
    "value_currency": null,
    "urgency": "BACKGROUND",
    "priority": "WATCH",
    "recommended_action": "TRACK UNTIL TENDER",
    "status": "OPEN",
    "notification_state": "NOT_ELIGIBLE",
    "feedback_state": "NONE",
    "provenance_json": "{\"licence\":\"http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/\",\"ocid\":\"ocds-h6vhtk-059b66\",\"release_id\":\"088822-2026\"}",
    "data_mode": "LIVE",
    "content_digest": "30074434ddda52418b2dbea312325519f26540820f4aa8b0ddf23fd8466eca8c",
    "created_at": "2026-09-18T15:00:25+00:00",
    "updated_at": "2026-10-09T14:00:28+00:00"
  }
]

CLASSIFICATION HISTORY

[
  {
    "event_type": "DISCOVERED",
    "previous_status": null,
    "new_status": "BACKGROUND",
    "occurred_at": "2026-09-18T15:00:26+00:00",
    "reason_json": "{\"kill\":[\"source evidence withdrawn\",\"commercial fit contradicted\",\"route proven impossible\"],\"promotion\":[\"partner plausibility UNPROVEN: explicit supplier willingness and subcontract route required\"]}"
  }
]