TENDER · WATCH
The Appointment of a Fire Remedial Works Contractor
Royal Borough of Kensington and Chelsea
What happened?
Award notice from Royal Borough of Kensington and Chelsea. Relevance is supported by notice evidence.
Value
KNOWN · HIGH
KNOWN · HIGH
Urgency
BACKGROUND
BACKGROUND
Confidence
MEDIUM
MEDIUM
Recommended action
TRACK UNTIL TENDER
TRACK UNTIL TENDER
Facts
{
"award_values": [
{
"amount": 750000,
"currency": "GBP"
}
],
"buyer": "Royal Borough of Kensington and Chelsea",
"buyer_reference": "BIP1075570590",
"contact_email": "Procurement@rbkc.gov.uk",
"contact_name": null,
"contact_restrictions": [],
"contacts": [
{
"email": "Procurement@rbkc.gov.uk",
"organisation": "Royal Borough of Kensington and Chelsea",
"telephone": "+4402073613000"
}
],
"contract_terms": [
{
"endDate": "2029-10-13T23:59:59+01:00",
"startDate": "2026-10-15T00:00:00+01:00"
}
],
"cpv": [
{
"description": "Fire-prevention installation works",
"id": "45343000",
"scheme": "CPV"
}
],
"currency": "GBP",
"days_to_deadline": -22,
"deadline": "2026-10-14T00:00:00+01:00",
"deadline_conflict": false,
"deadline_kind": "TENDER",
"deadline_narrative": "",
"deadline_structured": "2026-10-14T00:00:00+01:00",
"deadline_time_unpublished": false,
"demo_evidence": [],
"direct_contact_evidence": [],
"engagement_route": "",
"estimated_value": 750000,
"expansion_scope": "Complete official OCDS release; linked restricted documents require separate verification.",
"extensions": [],
"fully_expanded": true,
"geographic_scope": [
[
{
"countryName": "United Kingdom",
"region": "London"
}
]
],
"hidden_opportunity": false,
"historical_engagement_evidence": "",
"incumbent_evidence": [],
"linked_documents": [],
"lot_count": 0,
"lot_scope": [],
"meeting_evidence": [],
"notice_type": "AWARD",
"procurement_method": "Restricted procedure",
"procurement_status": "complete",
"publication_date": "2026-10-19T11:31:17+01:00",
"published_corrections": [],
"published_notice_types": [],
"published_requirement": "This Royal Borough of Kensington & Chelsea Tender specification outlines the requirements for the FRA Remedials and Fire Door Remedials works to be carried out in accordance with the findings of the Fire Risk Assessment (FRA) report and the fire door inspections. The remedial works are necessary to bring the property in line with relevant fire safety regulations and ensure that fire safety measures are fully compliant with current legislation, codes of practice, and guidelines.",
"questionnaire_evidence": [],
"reference": "e5a07030-18c2-4e51-b7b2-bae7a21c4d6b-918268",
"registration_evidence": [],
"relevance_evidence": {
"REMEDIAL_ENGINEERING": [
"remedial work"
]
},
"requirement_items": "",
"selection_requirements": [],
"sme_suitability": [
{
"sme": false,
"vcse": false
}
],
"submission_method": "UNKNOWN",
"value_excluding_vat": null,
"value_including_vat": null,
"value_minimum": null,
"value_scope": "TOTAL_NOTICE_NOT_PURA_ADDRESSABLE",
"vat_basis": "VAT basis not explicit in release"
}Commercial inferences
[]
Unknowns
[]
Possible services
[
{
"confidence": "MEDIUM",
"rationale": "remedial work",
"service": "REMEDIAL_ENGINEERING"
}
]Provenance
{
"licence": "http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
"ocid": "ocds-b5fd17-988bb283-bf50-4c67-97b0-b99808b1f601",
"release_id": "e5a07030-18c2-4e51-b7b2-bae7a21c4d6b-918268"
}Related signals
[]